Contracts
Surveying, architecture & engineering in North West
Public sector contract notices in surveying, architecture & engineering covering North West, from Find a Tender and Contracts Finder.
Surveying, architecture & engineering notices in North West
-
ClosedSmall-firm friendlyFramework
Coating Condition Surveys
CalMac Ferries needs condition surveys of protective coatings across its fleet of 36 ferries on the west coast of Scotland, to support a coatings management plan aligned with IMO Performance Standard for Protective Coatings.
-
ClosedFramework
Environmental Safety Case: General Tech inc Geological & Hydrogeological
NWS is establishing an open framework for specialist technical support to its Environmental Safety Case team. The work involves qualified staff to deliver scoped packages supporting the Low Level Waste Repository's regulatory obligations and forward programme.
-
ClosedSmall-firm friendlyFramework
Sitewide Planning Consultancy Framework for Science and Industry Museum, Manchester
Strategic planning advice to support delivery of the Science and Industry Museum Manchester Masterplan. The consultant will coordinate with Manchester City Council planning department and design teams, and handle planning queries that arise during the contract term.
-
ClosedSmall-firm friendly
Bridge Scour Level 2 Inspections 2026 (56 Structures)
Tameside Council needs Level 2 scour inspections on 56 bridge structures. The work is scheduled for 2026.
-
ClosedSmall-firm friendly
Legionella Water Temperature Monitoring
Lancashire County Council is splitting legionella water temperature monitoring and inspection services into two geographical contracts (north and south) across its county premises. Work includes regular monitoring, inspections to meet HSE ACOP L8, and reactive repairs.
-
ClosedSmall-firm friendly
Wigan Council - Portable Appliance Testing (PAT)
Wigan Council needs a supplier to carry out Portable Appliance Testing (PAT) across its premises and assets. The contract is valued at £150,000.
-
ClosedSmall-firm friendly
Cheshire and Warrington Combined Authority - Transport Operating Model, Functions Assessment and Transition Planning
Cheshire and Warrington Combined Authority needs consultants to assess its transport functions and design an operating model. Deliverables must be detailed enough to go straight to implementation, not high-level strategy.
-
ClosedSmall-firm friendly
Quantity Surveying, Cost Consultancy and Project Management Services for an Integrated Contact Centre
North West Ambulance Service needs a quantity surveyor and cost consultant to help their estates department procure professional design services for an integrated contact centre. The role covers cost consultancy and project management for this development.
-
ClosedSmall-firm friendlyFramework
Countryside Land Management and Estate Maintenance Framework
Lake District National Park Authority is building a multi-supplier framework agreement for countryside land management and estate maintenance work. Suppliers can bid for one or more lots and do not need to offer all services within a lot, only at least one.
-
ClosedSmall-firm friendly
Sandscale Integrated Depot - RIBA 3 Design Study
Westmorland and Furness Council needs RIBA Stage 3 design and cost documentation for an integrated depot at Sandscale Park in Barrow-in-Furness, including technical surveys, environmental assessments, and planning support work. The design must account for modular buildings and existing infrastructure at the site.
-
ClosedSmall-firm friendly
Prioritised Capital Improvements Programme - School Properties 2026-28
Cumberland Council wants to appoint two firms (architects, building surveyors, and M&E engineers) to design a prioritised capital improvements programme for schools. Work will mostly happen during school holidays, running from November 2026 for two years.
-
ClosedSmall-firm friendly
Re-purposing Penrith Town Hall into a Creative and Community Hub
Westmorland and Furness Council wants to appoint a lead multi-disciplinary consultancy team to design and deliver the conversion of Penrith Town Hall, a Grade II listed building, into a creative and community hub with a museum. The team will take the project through RIBA Stages 0-6, building on an existing outline business case.
-
ClosedSmall-firm friendly
Prioritised Capital Maintenance - Corporate Properties Consultant Appointment 2026-2028
Cumberland Council wants a professional services provider to manage design, procurement and delivery of maintenance and improvement projects across its corporate property portfolio over two years. The appointed consultant must provide architectural, building surveying, mechanical and electrical engineering, structural engineering and quantity surveying capability, either in-house or through partners.
-
ClosedSmall-firm friendly
Station Gateway & King Street Investment & Delivery Framework
Wigan Council wants a multidisciplinary consultancy team to produce an evidence-led framework and delivery plan for regenerating the Station Gateway and King Street area in Wigan town centre. The work builds on existing masterplans and programme documents to guide investment, connectivity, heritage-led regeneration, and economic activity.
-
ClosedSmall-firm friendly
James Rennie School at Bishop Harvey Goodwin School, Carlisle - Consultancy Services
Cumberland Council wants a multidisciplinary consultant to design the refurbishment and adaptation of accommodation at Bishop Harvey Goodwin School in Carlisle. The work covers RIBA Stages 0-7 (full design and professional services) for a construction project valued at £1.1 million.
-
ClosedSmall-firm friendly
Consultant Support in relation to Peak Cluster NSIP
The Peak District National Park Authority needs multidisciplinary consultancy support for its role as statutory consultee on a carbon capture and storage pipeline development consent order. Work covers project management, infrastructure planning, landscape, cultural heritage, archaeology and ecology.
-
ClosedSmall-firm friendly
Manchester Piccadilly Strategic Regeneration Framework Update
Manchester City Council wants a consultancy team to update their Strategic Regeneration Framework for the Piccadilly area, incorporating Northern Powerhouse Rail station plans and integrating outputs from adjacent regeneration frameworks.
-
ClosedSmall-firm friendly
A66 Northern Trans-Pennine (NTP) - Warcop MoD Pre-Construction ECI, Temp Works & Flood Modelling
Kier Infrastructure needs a consultant or subcontractor for pre-construction engineering input, temporary works design, and flood modelling on the A66 Northern Trans-Pennine scheme at Warcop MoD. Work includes design review, constructability assessment, pricing, programming and coordination.
-
ClosedSmall-firm friendlyFramework
Technical Services Framework - Managing Agent
The Crown Estate is establishing a 13-lot framework to access specialist technical services across its UK portfolio. Suppliers can bid for one or more lots covering sectors including minerals, telecoms, offshore wind, ports, marine infrastructure, and energy.
-
Closed
Calibration and Maintenance of Radiological Instruments - Installed 2027+
Calibration and maintenance of radiological instruments at NRS sites, including facilities transferred from EDF as AGR plants close. The contract starts when new instruments are installed in 2027.
-
Closed
Calibration and Maintenance of Radiological Instruments - Portable 2027+
Calibration and maintenance of portable radiological instruments across Nuclear Restoration Services sites, including sites transferring from EDF's AGR programme. Contract runs from 2027.
-
ClosedFramework
Technical and Highways Works Framework
Salford City Council is establishing an open framework to deliver technical and highways works over several years. The framework has an estimated total value of £300m and will reopen for new suppliers at years 3 and 6.
-
ClosedSmall-firm friendlyFramework
C3770 Framework for Construction Related Consultancy
Cheshire East Council is establishing an eight-lot framework for construction-related professional services including architectural, engineering, surveying, and CDM advisory work. The framework will serve the council, its wholly owned companies, schools, academies, and associated organisations across Cheshire and potentially Warrington, Cheshire West and Chester, and the Mayoral Combined Authority.
-
Closed
Electric Vehicle Charging Infrastructure
Lancashire County Council is procuring installation of public electric vehicle charging points across the county, funded by the government's Local Electric Vehicle Infrastructure scheme. The work includes both standard chargepoints and lamppost-integrated chargers.
-
Closed
GMCA 1185 Salford Road MRF Equipment
GMCA is procuring design, build, installation, commissioning and testing of new commingled dry recycling sorting equipment for a materials recovery facility at Salford Road, Over Hulton, Bolton. The new plant will process 140,000 tonnes per annum of mixed dry recyclables collected across Greater Manchester.