Contracts
Construction & building works
Public sector contract notices in construction & building works, from Find a Tender and Contracts Finder.
Narrow by region
Construction & building works notices
-
ClosedSmall-firm friendly
Supply and Installation of On-Street Modular Bin Hubs and Associated Waste Infrastructure
Liverpool City Council wants to replace 850 communal bin sites with new modular hub structures that house the bins and include resident messaging. The work covers supply and installation of the hubs and associated waste infrastructure.
-
ClosedSmall-firm friendly
PRP317(525100) Landscaping Works at Spring Cottage, Grin Low Road Buxton, SK17 6UJ
Derbyshire County Council wants a Principal Contractor to carry out external landscaping at Spring Cottage in Buxton. The work includes a new asphalt driveway, paving, fencing, and planting.
-
ClosedSmall-firm friendly
Transport Workshop Floor Replacement
West Yorkshire Fire and Rescue Authority needs to replace the resin floor in their transport workshop, garage and associated areas. The work may include removing the existing floor and disposing of it.
-
ClosedSmall-firm friendly
MAYFIELD COURT ANNEX DEMOLITION PROJECT
Demolition of an annex building at Mayfield Court in Liverpool. The notice does not state the scope of preparatory work, site clearance, or earthmoving beyond demolition.
-
ClosedSmall-firm friendly
Contract for Gully Pot Alterations & Minor Drainage Works
Swansea Council needs gully pot alterations and minor drainage work at West Cross. The contract is worth £135,000.
-
ClosedSmall-firm friendly
Kingsway Tunnel Refurbishment (Dado Panels)
Refurbishment and/or replacement of dado panel systems in the Kingsway Tunnel, a major transport infrastructure asset. Work includes condition assessment, design development, removal and installation, integration with tunnel systems, and traffic management.
-
ClosedSmall-firm friendlyFramework
Framework for the provision of playground equipment - Design, Supply & Installation (2 lots)
Blackpool Council is establishing a framework for design, supply and installation of playground equipment across approximately 30 play areas in the town. The framework will cover small replacement works and large-scale refurbishments, including surfacing, fencing, design services and maintenance support.
-
ClosedSmall-firm friendly
Escalator Safety Interventions
TfL is upgrading safety features across London Underground escalators. Work includes installing comb switches, step tube assemblies, and missing step detectors on multiple machines.
-
ClosedSmall-firm friendly
The Sherwood Primary School water heater replacement
London Borough of Merton is replacing a water heater at Sherwood Primary School. The work must be done during the summer holiday period from 21 July to 21 August 2026.
-
ClosedSmall-firm friendly
design and re-development of the KS1 and KS2 areas at Nova Primary Academy
Design and redevelopment of outdoor playground areas for KS1 and KS2 at Nova Primary Academy. Work includes groundworks, safety surfacing, play equipment supply and installation, and removal of existing equipment, all to BS EN 1176 standards.
-
ClosedFramework
EEM0051 - Scaffolding Framework
Efficiency East Midlands is recruiting suppliers for a scaffolding framework to replace their current one, which expires in September 2026. The framework will cover erection, dismantling, removal, surveys, design and handover for domestic and commercial properties.
-
ClosedSmall-firm friendly
RMBC - Provision of Communal Boilers Replacement at Floral House, Chertsey KT16 and Heatherfields, New Haw KT15 - 2026
Runnymede Borough Council wants a contractor to replace three communal boilers and associated plant at two retirement living schemes: Floral House (59 flats) and Heatherfields (30 flats). The work includes removal, replacement of boilers, hot water cylinders, pipework and plant room equipment across both sites over 14 weeks.
-
ClosedSmall-firm friendlyFramework
Scaffolding Contractor Framework for Choice Services Ireland
Choice Housing Ireland is setting up a framework agreement for scaffolding contractors to provide erection, dismantling, and general scaffolding work. They're looking to pre-qualify suppliers for call-off work across their operations.
-
ClosedSmall-firm friendly
Delivery of New Homes at Newlyn - Coastline
Coastline Design & Build is tendering a design-and-build contract to construct 29 affordable homes in Newlyn, Cornwall. The site has conditional planning permission and designs are at RIBA Stage 4; the contractor will complete detailed design and start on site by October 2026.
-
ClosedSmall-firm friendly
Provision of a new boiler system in the Skiddaw Building at Fusehill Street Campus,Carlisle
The University of Cumbria needs a replacement boiler installed in the Skiddaw Building at their Fusehill Street Campus in Carlisle. This is a single boiler replacement project.
-
ClosedSmall-firm friendly
Maintenance Painterwork MTC
Rutherglen & Cambuslang Housing Association seeks a painter to carry out maintenance repainting work on their housing stock according to their maintenance schedule and specification.
-
ClosedSmall-firm friendly
Contract for Electrical works at West Cross
Swansea Council needs an electrical subcontractor to remove and reinstate external electrical accessories during external wall insulation works at West Cross properties. Work includes upgrading meter tails and cabling, and installing new external lighting where needed.
-
ClosedSmall-firm friendlyFramework
Framework for Installation, Repair & Maintenance of Door Entry Systems, CCTV, Alarm and Access Systems
Cardiff Council is establishing a framework for installation, repair and maintenance of door entry systems, CCTV, alarm systems and access control. The contract runs for 2 years from 1 February 2027 with an option to extend for a further 2 years.
-
ClosedSmall-firm friendly
Replacement of Calorifiers at Arnold Leisure Centre
Gedling Borough Council wants to replace the domestic hot water heaters at Arnold Leisure Centre. The work includes supply, installation, commissioning and setting to work of the new hot water system.
-
ClosedSmall-firm friendly
Flat Roof Replacement - Matthews Way, Stroud, Gloucestershire
Stroud District Council wants the flat roof replaced at 42–44 Matthews Way, Stroud, to a Proteus specification. The work is at a single residential property.
-
ClosedSmall-firm friendly
Burnt Oak School Wall
Medway Council needs repairs to a boundary wall in Burnt Oak School's playground. The work is scoped as wall repairs only.
-
ClosedSmall-firm friendly
Ricards Lodge School 6th Form Block Works
Roof replacement works to the 6th Form Block at Ricards Lodge High School. The work must be completed during the summer holiday 2026.
-
ClosedSmall-firm friendly
ITT 30/2026 - PEACEPLUS PP1005 Altnaveigh House Refurbishment Project
Refurbishment of an existing operational community facility (Altnaveigh House) including mechanical and electrical upgrades, washroom systems, fire doors, internal electrical and water services, and CCTV installation. Six-week project starting August 2026.
-
ClosedSmall-firm friendly
ITT 31/2026 - PEACEPLUS PP1024 Schomberg Society Kilkeel Refurbishment Project
Mechanical and electrical upgrades plus general refurbishment work at an existing community facility in Kilkeel that remains operational during works. Six-week project starting August 2026.
-
Closed
Wyndhurst Orchard Wadebridge & Bederkesa Court Bodmin Lift Renewals
Corserv Solutions is appointing a contractor to replace lifts at two residential buildings in Cornwall: Wyndhurst Orchard in Wadebridge and Bederkesa Court in Bodmin. Full scope details are in the specification documents.