Contracts
Construction & building works in South East
Public sector contract notices in construction & building works covering South East, from Find a Tender and Contracts Finder.
Construction & building works notices in South East
-
ClosedSmall-firm friendly
Car Park Enhancements - BPC
Binfield Parish Council wants to enhance its car park at The Parish Office with accessibility improvements: new tactile paving, designated disabled bays, porous asphalt surfacing, kerb adjustment, and fencing. Work follows an access audit and must comply with CDM regulations and local conservation requirements.
-
ClosedSmall-firm friendly
REPAIR WORKS 26A WEST END WITNEY
West Oxfordshire District Council needs urgent stabilisation and repair works to a Grade II Listed building in Witney. The scope includes roof and chimney repairs, rainwater goods, limited structural timber work, dormer window replacement, and securing the vacant property.
-
ClosedSmall-firm friendly
Spitfire Way works contract
Thanet District Council is leasing a former airport vehicle maintenance workshop and needs modernisation and enabling works before it can be used to maintain their fleet of 113 vehicles including 41 HGVs. The building already has maintenance pits and is purpose-built for HGV work; the supplier will carry out the necessary updates and obtain Building Regulations approval.
-
ClosedSmall-firm friendly
Hanslope Play Area Improvement
Milton Keynes City Council wants to improve Hanslope Recreation Ground's play area with new equipment, resurfacing, landscaping, and better pedestrian access. Works include remedial landscaping, play equipment upgrades, and safety improvements.
-
ClosedSmall-firm friendly
CA18229 - B1 Ward Nurse Call Replacement
Replace an existing wireless nurse call system with a new hardwired system on B1 Ward. Work involves electrical installation.
-
ClosedSmall-firm friendly
Guildhall Refurbishment
Winchester City Council is refurbishing Winchester Guildhall, a historic building, including internal redecoration, ceiling and partition removal, toilet replacement, M&E plant renewal, external stonework and roof work, and restoration of masonry at Abbey House. The appointment is phased: pre-construction stage followed by construction stage.
-
ClosedSmall-firm friendly
Poult Wood Golf Club Air Source Heat Pumps
Tonbridge & Malling Borough Council wants to install air source heat pumps at Poult Wood Golf Club to replace the current oil heating system. The facility includes a clubhouse, squash courts, changing rooms, a flat, and associated buildings.
-
ClosedSmall-firm friendly
RMBC Provision of Void Refurbishment Works and PlannedMinor Works 2026
Runnymede Borough Council wants a contractor to carry out void refurbishment works and planned minor works for a two-year contract starting 2026, with optional extension. The scope is set out in Schedule B of the tender documents.
-
ClosedSmall-firm friendlyFramework
Trees and Countryside Framework 2026
Guildford and Waverley Borough Councils are establishing a multi-supplier framework to appoint organisations for arboricultural and countryside works across both council areas.
-
ClosedSmall-firm friendly
Gauntlet Play Park Refurbishment
Havant Borough Council wants to design and build a new play provision at Gauntlet Park in Crookhorn, Havant, working within the existing footprint. The contract also covers additional refurbishment works at the site and possibly other locations (notice is cut off mid-sentence about the full scope).
-
ClosedSmall-firm friendly
Egrets Way Path Resurfacing Works (Piddinghoe-Southease), Piddinghoe, East Sussex
Resurfacing approximately 1.65km of the Egrets Way permissive path between Piddinghoe and Southease. The existing unbound limestone gravel surface needs replacing due to wear, sheep grazing, and occasional farm vehicle use.
-
ClosedSmall-firm friendly
Elvetham Heath Parish Council extension to Multi Use Games Area
Elvetham Heath Parish Council wants to extend an existing multi-use games area with basketball and goal mouth equipment, a rebound wall, tarmac surfacing, and associated groundworks. The work includes security fencing for the duration of the project.
-
ClosedSmall-firm friendly
Concrete Skatepark and Wheeled Sports Facility
Design and build a concrete skatepark and wheeled sports facility at Crabtree Park in Camberley. The scope is not detailed in the notice.
-
ClosedSmall-firm friendly
ESC GPN and GPS Boiler Replacement Project - EOI / Participation Stage
East Surrey College wants to replace or upgrade boiler plant at two sites (Gatton Point North and South). This is an expressions of interest stage to shortlist contractors for formal tender.
-
ClosedSmall-firm friendly
Provision of Estates Development Programme Project in relation to Langley Fire Station
Major refurbishment of a 1963-built fire station including room conversions, new partitioning, lift installation, and updates to electrical, mechanical and drainage services. Work covers internal layouts, accessibility improvements, and building systems.
-
ClosedSmall-firm friendly
Quotation for Fleet Pond Stock Fencing
Hart District Council needs removal of existing fencing and installation of approximately 1800 metres of ClipEx stock fencing at Fleet Pond SSSI in two adjoining areas.
-
ClosedSmall-firm friendly
HVPS Electrical Installation
The UK Atomic Energy Authority needs electrical installation of high-voltage power supply plant and equipment in Building D15. The contractor will supply experienced personnel to carry out the work in an industrial/scientific facility setting.
-
Closed
EKC Group Ashford College - Phase 3.
East Kent Colleges Group is seeking a main contractor to deliver Phase 3 of their Ashford College campus expansion: a new three-storey block with circa 1,700m² of space including a junior college, student union facilities, classrooms, IT suites, and workshop spaces. The contractor will manage RIBA Stages 4–7 (detailed design through completion).
-
ClosedSmall-firm friendly
Tunnel Segment Production Monitoring System
Sizewell C needs a monitoring and traceability system for 39,000 precast concrete tunnel segments manufactured at Avonmouth, transported by road and rail, stored across four facilities, and installed in three tunnel boring machines. The system must track segments from casting through installation and maintain quality, inventory and supply chain transparency.
-
ClosedSmall-firm friendly
NNR19/0558 - Stodmarsh Ditch Restoration with associated bund creation and culvert creation
Restoration of a historic ditch at Stodmarsh National Nature Reserve, including reprofiling, bund creation, and culvert installation. The site contains deep soft silt in places that may not support standard excavators.
-
ClosedSmall-firm friendly
Strood Wetside Refurbishment Works
Medway Council wants to refurbish the wetside area (pool facilities) at Strood Leisure Centre. Work is defined in a specification document available on the portal.
-
ClosedSmall-firm friendly
Kent Grazing Project – Infrastructure Works
Kent County Council is seeking a contractor to deliver infrastructure works for a landscape-scale nature recovery project across multiple sites in North Kent. The work includes stock-proof fencing, gates, scrub clearance, water infrastructure, and access track construction, coordinated across several chalk grassland sites between Autumn 2026 and Autumn 2027.
-
ClosedSmall-firm friendly
Tunnel Segment Production Monitoring System copy
Sizewell C Limited needs a system to track approximately 39,000 precast concrete tunnel segments from manufacture through transport, storage at four facilities, and final installation in three tunnel boring machines. The system must provide end-to-end visibility, quality traceability, inventory management, and prevent installation errors across the entire supply chain.
-
ClosedSmall-firm friendly
Waterproofing and resurfacing works to Brookfield Court
Ashford Borough Council needs waterproofing and resurfacing work on the walkway and flat roofs over a lower commercial unit at Brookfield Court. The work must use Triflex roofing and walkway systems or an approved equivalent, with all enabling works included.
-
ClosedSmall-firm friendly
Whitehouse Archaeological Mitigation Excavation for Cricket Ground Works
Milton Keynes City Council needs archaeological investigation and mitigation work ahead of cricket ground development. The work includes excavation, recording, and reporting of archaeological remains over eight months.