Contracts
Construction & building works in North West
Public sector contract notices in construction & building works covering North West, from Find a Tender and Contracts Finder.
Construction & building works notices in North West
-
ClosedSmall-firm friendly
M6 Lune Gorge - Roundthwaite Box - Steelwork Package
Kier Infrastructure needs contractors for steel fabrication, cutting and burning of piles as part of the Roundthwaite Box solution in M6 Lune Gorge central reservation works. Work includes producing steel fabrication drawings and executing the fabrication.
-
ClosedSmall-firm friendlyFramework
National Framework for Developer-Led Schemes
YPO is establishing a four-year national framework for developers to deliver construction projects across all building types for public and private sector clients. The framework will be open to multiple developers and managed through a single agreement.
-
ClosedSmall-firm friendly
45 Netherby Drive Extension Demolition and Rebuild
Demolition and rebuild of an extension at 45 Netherby Drive. The notice gives no further detail on scope, specification, or timeline within the project period.
-
ClosedSmall-firm friendly
Tameside College - Contractor for Portal Framed Building
Tameside College is seeking a contractor to design, supply, and construct a new Construction Skills Hub building on their campus. The building has already obtained planning approval under permitted development.
-
ClosedSmall-firm friendly
Contract for the development of a car park and Garden of Remembrance
Oswestry Rural Parish Council wants a new permeable car park with drainage, fencing and landscaping at Trefarclawdd Cemetery in Trefonen. The scope is set out in a specification and scope of work document.
-
ClosedSmall-firm friendly
Highways - A5 Road Restraint System Repairs and Upgrades
Wirral Council needs one-year maintenance and upgrade work on existing road restraint systems (barriers, guardrails, etc.) along the A5. The contract covers repair and upgrade of these systems.
-
ClosedSmall-firm friendlyFramework
Show Homes: Interior Design Framework
Plumlife Homes is establishing a framework for interior design services covering concept development, FF&E selection, project management, and installation oversight for show homes across the North West. The framework will run for multiple projects rather than a single engagement.
-
ClosedSmall-firm friendly
Supply and Installation of On-Street Modular Bin Hubs and Associated Waste Infrastructure
Liverpool City Council wants to replace 850 communal bin sites with new modular hub structures that house the bins and include resident messaging. The work covers supply and installation of the hubs and associated waste infrastructure.
-
ClosedSmall-firm friendly
MAYFIELD COURT ANNEX DEMOLITION PROJECT
Demolition of an annex building at Mayfield Court in Liverpool. The notice does not state the scope of preparatory work, site clearance, or earthmoving beyond demolition.
-
ClosedSmall-firm friendly
Kingsway Tunnel Refurbishment (Dado Panels)
Refurbishment and/or replacement of dado panel systems in the Kingsway Tunnel, a major transport infrastructure asset. Work includes condition assessment, design development, removal and installation, integration with tunnel systems, and traffic management.
-
ClosedSmall-firm friendlyFramework
Framework for the provision of playground equipment - Design, Supply & Installation (2 lots)
Blackpool Council is establishing a framework for design, supply and installation of playground equipment across approximately 30 play areas in the town. The framework will cover small replacement works and large-scale refurbishments, including surfacing, fencing, design services and maintenance support.
-
ClosedSmall-firm friendly
Provision of a new boiler system in the Skiddaw Building at Fusehill Street Campus,Carlisle
The University of Cumbria needs a replacement boiler installed in the Skiddaw Building at their Fusehill Street Campus in Carlisle. This is a single boiler replacement project.
-
ClosedSmall-firm friendly
M6 Lune Gorge - Roundthwaite Box - Civils Package
Kier Infrastructure needs contractors for civils work on the M6 Lune Gorge scheme near junction 38, including drainage, excavation, pile cutting, demolition and backfilling. Work is part of the Roundthwaite Box solution in the central reservation.
-
ClosedSmall-firm friendly
M6 Lune Gorge - Roundthwaite Box - Fibre Reinforced Concrete Package
Kier Infrastructure is seeking contractors for a fibre reinforced concrete package on the M6 Lune Gorge scheme. The work includes precast L-Units and in situ concrete works for the Roundthwaite Box solution in the central reservation.
-
ClosedFramework
Merseytravel Electrical Framework 2026-2030
Liverpool City Region Combined Authority is establishing a single-supplier framework for electrical works across its transport, operational and infrastructure assets. The work covers replacement, maintenance, upgrades, testing, fault diagnosis and emergency response on low and high-voltage systems, power distribution, lighting and associated services.
-
ClosedSmall-firm friendly
Queens Park Lodge House, Queens Park, Ormerod Road, Burnley, Lancashire, BB11 3QW
Refurbishment of Queens Park Lodge House including external elevations, roof repair, full M&E replacement, internal finishes, and window and door replacement. Work to start August 2026.
-
ClosedSmall-firm friendly
Fit-Out Contractor for Charles Carter Building
Fit-out work for the Charles Carter Building at University of Lancaster. Budget £300k including VAT.
-
ClosedFramework
S1083 - Framework for Demolition and Associated Services
Salford City Council is establishing a new demolition and associated services framework to replace their expiring August 2026 framework. The contract runs for four years with a total value of £250 million.
-
ClosedSmall-firm friendly
New Build Property: 10a Briercliffe Road, Burnley BB10 1XQ
Burnley Borough Council is inviting tenders to build a new house on the end of an existing terraced row at 10a Briercliffe Road. The work is expected to run 6 months from early August 2026 to mid-February 2027, subject to weather and agreement with the successful contractor.
-
ClosedSmall-firm friendly
Home Ownership Communal Flooring Replacement Programme 26-30
Survey, measure, supply and install replacement flooring in communal areas across Onward Group's housing portfolio. Work includes subfloor prep, removal of existing finishes, trims, adhesives and waste disposal.
-
ClosedSmall-firm friendly
Refurbish the outside of the studio building at the Holmes Chapel Community Centre
Holmes Chapel Parish Council needs to refurbish the deteriorating external cladding on the studio building at their community centre. The work should focus on the most affected sides, with attention to visual impact on the neighbouring residential area.
-
ClosedSmall-firm friendly
Highways Term Maintenance HM4 - Signs, Nameplates and Guardrails
Sefton Council wants supply, installation, maintenance, and replacement of street nameplates, traffic signs, and pedestrian guardrails across the borough. The 8-year contract runs for 5 years with up to three 1-year extensions subject to performance review.
-
ClosedSmall-firm friendly
A66 Northern Trans-Pennine Project (NTP) - Schemes 1 and 2 Central Reservation Works - Phase 2
Kier Infrastructure is seeking contractors for Phase 2 central reservation hardening works on the A66 Northern Trans-Pennine project, an 80km dual carriageway upgrade scheme between the M6 and A1. The contract is worth £850,000.
-
ClosedSmall-firm friendly
Allerton High Level Access Platform
Northern Trains wants a contractor to design and build high-level access platforms for safe working at height on trains at Allerton depot. The platforms will serve four-car trains (Classes 323, 768, 331) with safety features, fall protection, and integration with overhead line isolation systems.
-
ClosedFramework
Domestic Property Disability Adaptations Framework for the Provision of Level Access Showers and Shower over Baths
Oldham Council seeks contractors to supply and install level access showers and shower over baths in disabled residents' homes, plus associated work such as flooring, joinery, electrics and plasterwork. The Council will appoint two contractors but guarantees no minimum volume.