Contract Opportunity for Aerial Replacement Project at Peverel House
Design, supply, and installation of a new Fibre Integrated Reception System (FIRS) to replace existing aerial infrastructure. Full specification in tender documents.
-
ClosedSmall-firm friendlyFramework
Festive Lighting and Christmas Trees
Westminster City Council wants to appoint a supplier for festive lighting and real Christmas tree services across multiple sites in Westminster. The contract is menu-based, allowing ward councillors to order installation, maintenance, removal and optional decoration services as needed.
-
ClosedSmall-firm friendly
NK College EICR Remedials all sites
North Kent Colleges needs contractor to complete electrical installation condition report (EICR) recommendations classified as C1, C2, and FI across all their sites. Work involves remedial electrical installation and wiring.
-
ClosedSmall-firm friendly
CA18160 - R9318 Frank Deas Phase 2
Phase 2 of fire remedial works at St Helier Hospital, refurbishing the lobby area, store room and kitchen to meet current Building Regulations and fire safety standards.
-
Closed
Longford and Bell Court Major Works
Complete major refurbishment of two residential blocks: Longford Court (16 storeys) and Bell Court (4–5 storeys). Works include roof replacement, windows, bathrooms, kitchens, heating systems, drainage, ventilation, balcony structural repairs, and external façade remedials.
-
ClosedSmall-firm friendlyFramework
Old Oak Private Sector Partner Procurement
The Old Oak and Park Royal Development Corporation is seeking a Private Sector Partner to enter a long-term Joint Venture for the comprehensive regeneration of a 31-hectare brownfield site in west London. The scheme will deliver approximately 8,000 homes, up to 200,000 sq m of commercial and community space, and associated infrastructure anchored by Old Oak Common station.
-
ClosedSmall-firm friendly
CA18117 - QMHC LIFT 14 MODERNISATION STH
The NHS Trust is modernising Lift 14 at St Helier Hospital, replacing the machine, controller, wiring, doors, car, and shaft equipment. Work follows the lift specialist's specification.
-
ClosedSmall-firm friendly
Ivatt Place Playground Upgrade
Design, fabrication and installation of bespoke play structures, proprietary play elements, street furniture, and waterproof feature lighting for a playground upgrade. Hard and soft landscaping with safety surfacing, including a community planting day.
-
ClosedSmall-firm friendly
Southall Fire Station - Gym Extension
London Fire Brigade wants remodelling and redecoration of an existing building at Southall Fire Station, plus a new gym extension. The works include specified repairs throughout.
-
ClosedSmall-firm friendly
Southall Fire Station - Gym Extension
London Fire Brigade wants remodelling and redecoration of an existing building at Southall Fire Station, plus a new gym extension. The work includes specified repairs throughout.
-
ClosedSmall-firm friendly
For the provisions of Mobile Plant RRC's
LondonEnergy needs to procure mobile plants (likely waste handling equipment) fitted to specific waste recycling site requirements. The plants must include safety, visibility, and environmental control systems such as CCTV cameras, beacon lights, engine idle cut-off, and high-specification cab filters.
-
Closed
Lift Modernisation Works - 2026 to 2036
Southern Housing is procuring 4 contractors to carry out lift modernisation works across their portfolio over a 10-year period (5 years initial plus 5-year extension option). Contractors must handle resident liaison, act as Principal Designer and Principal Contractor under CDM and Building Safety Act requirements.
-
ClosedSmall-firm friendly
Provision of replacement Crane Gantry Cabs
Design, fabricate, and install three replacement operator cabs for gantry cranes, then commission them. Work includes design approval, fabrication, installation, and commissioning.
-
Closed
Ravensbury Main Works Phase 3A and 3B Option PSQ
Design and build 34 affordable houses (Phase 3A) plus option for 17 affordable flats (Phase 3B) with landscaping, access and infrastructure in Bromley. This is a pre-qualification stage; the full tender will follow.
-
ClosedSmall-firm friendly
Boiler Plantroom Refurbishment Works at Colley House, Uxbridge
Complete refurbishment of a communal boiler plantroom and heating system at a residential building in Uxbridge, including replacement of boilers, mechanical and electrical services, gas infrastructure, controls, ventilation, water treatment equipment, and 84 heat interface units in occupied flats.
-
ClosedSmall-firm friendly
Leys Park Changing Pavilion Dagenham, Refurbishment
Refurbishment of Leys Sports Pavilion changing rooms to create a new gym, including remodelling and alterations. Single-stage traditional tender under JCT Minor Works Building Contract with Contractors Design 2024.
-
ClosedSmall-firm friendly
CA18141 - R9317 - SHGH - Walkway Improvements
Refurbishment and improvement of external pedestrian pathways at St Helier Hospital, including footpath reconstruction, drainage, safety railings, markings and signage. Work will be phased in a live hospital environment with maintained emergency access.
-
ClosedSmall-firm friendly
Provision of Temporary Structures at ReActon Circular Economy Hub for West London Waste Authority
West London Waste Authority needs temporary structures installed at its new ReActon Circular Economy Hub in South Acton. The hub will house facilities for reuse, repair, and skills training.
-
ClosedSmall-firm friendly
Stanmore Fire Station – Roofing Replacement Project
London Fire Brigade needs to replace flat roofs on the main building and gymnasium at Stanmore Fire Station, including replacement of the existing PV system.
-
ClosedFramework
SH2025-029 Fire Safety Systems servicing, maintenance, remedials and installations.
Southern Housing seeks a service provider to service, maintain, carry out remedial works, and install fire safety systems across their portfolio. The contract runs on a price framework basis.
-
ClosedSmall-firm friendly
CA18229 - B1 Ward Nurse Call Replacement
Replace an existing wireless nurse call system with a new hardwired system on B1 Ward. Work involves electrical installation.
-
ClosedSmall-firm friendly
Guildhall - Great Hall Roof H&S Works
High-level repairs to Guildhall Great Hall roof including lantern and fleche refurbishment, stone slate repairs, masonry work, and rainwater systems. The building remains operational throughout; works must finish by late October 2027.
-
Closed
Energetik Primary Heating Network Extensions Part 2 (PSDS)
Energetik is extending its Meridian Water Heat Network in Enfield with two separate pipelines totalling approximately 3.4km. The contractor will design, build, and install the network, arrange pipe delivery from Denmark, procure joints and materials, and handle pre-construction surveys and trial works.
-
Closed
Lifts Supply, Installation, Maintenance, Modernisation and Refurbishment Works
Royal Borough of Greenwich is procuring lift supply, installation, maintenance, modernisation and refurbishment across the borough. The contract covers new lifts, components, servicing and upgrades to existing lift infrastructure.
-
ClosedSmall-firm friendly
Vehicle Removals and Car Pound Services
London Borough of Hackney is contracting for the removal of vehicles parked in contravention and nuisance vehicles, and the operation of a car pound facility. The work covers statutory enforcement under the Traffic Management Act 2004 and Refuse Disposal (Amenity) Act 1978.