Contracts
Construction & building works in London
Public sector contract notices in construction & building works covering London, from Find a Tender and Contracts Finder.
Construction & building works notices in London
-
ClosedSmall-firm friendly
Henry Cavendish Roofing Works
Strip and remove existing roofing coverings and replace with a new roofing system at Henry Cavendish. Work includes any necessary M&E plant adjustments.
-
ClosedSmall-firm friendly
HAR6171 Smithy Street - Infill Development Scheme
Tower Hamlets Council wants landscaping works at Stepney Park School, including a new MUGA pitch, play equipment, soft and hard landscaping, and tarmac. Work must complete and be handed over before autumn term 2026.
-
ClosedSmall-firm friendly
The Grange Roof Repairs and Refurbishment
London Borough of Haringey wants a principal contractor for essential roof repair and refurbishment of The Grange, a Georgian Grade II listed building. The work is valued at £450,000.
-
ClosedSmall-firm friendly
Ibrahim Batch 5 - Council
London Borough of Haringey needs bathroom adaptation work for one property, including installation of a stair lift and galvanised rails. The work is valued at £115,000.
-
Closed
PR-11057-PA-Roofing Contracts
PA Housing Limited is seeking contractors to deliver flat and pitched roof replacements, along with associated roofline and insulation work, to their properties across two regions. The contract runs for up to six years.
-
ClosedSmall-firm friendly
Tomorrow Gallery Exhibition Fit Out Main Contractor
Science Museum Group is seeking a main contractor for exhibition fit-out works on the Tomorrow Gallery. The contract is worth £1.8m.
-
ClosedSmall-firm friendly
Salvation Army Homes Fire Safety Servicing and Maintenance Contracts
Salvation Army Homes is contracting for fire safety servicing and maintenance across three geographic lots. Work includes electrical building installations, firefighting equipment maintenance, and related repair services.
-
ClosedSmall-firm friendly
Green Park - Linear Heat Replacement
TfL needs to replace fire detection and suppression systems on 11 escalators at Green Park station. The work involves installing aspirating smoke detection and upgrading to conventional sprinkler systems.
-
ClosedSmall-firm friendly
Environmental Services
East Sussex Fire Authority needs a contractor to empty and clean wastewater and storage tanks across its estate in East Sussex and Brighton and Hove, with potential maintenance and ad-hoc related work.
-
ClosedSmall-firm friendly
WLC Southall Boundary Fence
West London College needs a new security fence along the south boundary of its Southall campus, including manually operated vehicle and pedestrian gates, plus internal fencing sections to segregate the front elevation.
-
ClosedSmall-firm friendly
Servicing & Maintenance of L&Q Ventilation Systems
L&Q Housing Trust needs servicing, maintenance and reactive repair of ventilation systems across its housing stock. The work covers MVHR systems and communal/car park ventilation, including planned servicing, emergency repairs, and compliance reporting.
-
ClosedSmall-firm friendly
WP3380- Hard Landscaping (lot 1), Soft Landscaping (lot 2), & Kerb modifications (lot 3) and edge protection - CTA Main Works
Costain is seeking subcontractors for three lots of work at Heathrow: soft landscaping including replanting on steep embankments (1150m2), hard landscaping with permeable tarmac for an evacuation area (370m2), and kerb modifications with edge protection and security fencing. Work involves hazardous conditions near high-pressure fire suppression systems, live traffic, and footpaths.
-
ClosedSmall-firm friendly
WP3380- Hard Landscaping (lot 1), Soft Landscaping (lot 2), & Kerb modifications (lot 3) and edge protection - CTA Main Works
Costain seeks subcontractors for soft landscaping (embankment replanting on steep slopes with irrigation design), hard landscaping (permeable tarmac, about 370 m2), and kerb and edge protection work at Heathrow. The scope includes work near live traffic, footpaths, and high-pressure fire suppression systems.
-
ClosedSmall-firm friendly
WP4730 - Security Fencing CTA Tunnel
Costain Limited needs security fencing installed as part of CTA tunnel main works at Heathrow. The work covers approximately 300m of fencing in four types: key clamp rail, green security mesh at two heights, and aluminium parapet.
-
ClosedSmall-firm friendly
Golders Green Library Reading Garden
London Borough of Barnet is transforming a derelict outdoor area behind Golders Green Library into a sensory reading garden. The project involves design and build work to create an attractive garden space.
-
ClosedSmall-firm friendly
Gordon Gourt: Capital Works – Main Contractor
jLiving seeks a main contractor for capital works at Gordon Court in Edgware. The scheme retains and reconfigures the existing 33-flat building, adds two new storeys to parts of it, and creates 11 additional affordable rented flats.
-
ClosedSmall-firm friendly
2526-0628 Wray Crescent Park Building – Building Contractor
Demolish existing cricket pavilion at Wray Crescent Park in Islington and build a replacement single-storey sports and community building with office space, plus landscaping and park improvements. Must complete before April 2027.
-
ClosedSmall-firm friendly
Harris Academy Battersea - Modular refurb works
Refurbishment of a modular building at Harris Academy Battersea. The contractor will design and deliver the construction works.
-
ClosedSmall-firm friendly
Roofing Works: Lambeth
Watmos Community Homes is replacing flat roofing on two social housing estates. Work includes new flat roof installation with associated drainage, plumbing and guttering on a 2-storey building and 11 bungalows.
-
Closed
25-225 Lot 1 Woodridings Court Modular Building Fabrication and Installation
London Borough of Haringey is procuring the fabrication and installation of a modular building at Woodridings Court. The contract covers design, manufacture and on-site installation of the modular units.
-
ClosedSmall-firm friendly
Acacia centre roof overlay works
Emergency roofing works to fix long-standing water ingress at Acacia Centre in Mitcham. The work involves overlaying the roof with a new plywood deck and applying a high-performance liquid waterproofing system with PIR insulation to meet Building Regulations.
-
ClosedSmall-firm friendly
Hillcross Primary School Phase 2 Roof Works
Overlay of existing felt roofs with high performance bitumen felt system at Hillcross Primary School. Work includes rainwater goods overhaul, removal and reinstatement of solar PV panels, and targeted internal repairs from water damage.
-
ClosedSmall-firm friendly
Melrose School Roof Works
London Borough of Merton is seeking a contractor to apply felt overlay to flat roofs at Melrose School where water ingress has caused damage. The work is scheduled for 6 weeks from late July to 2 September 2026.
-
ClosedSmall-firm friendly
Joseph Hood, Poplar and Singlegate Primary Schools Roof Works
Roof replacement at two primary schools in Merton. Work must be completed during the summer holiday period from 21 July to 31 August 2026.
-
ClosedSmall-firm friendly
Bedelsford School Chaucer Centre Remedials
Phase 2 remedial works at a newly opened SEN school in Morden. Work includes boxing pipes and radiators, replacing fire doors, and extending access controls, mostly on the first floor, to be completed during summer 2026.